Analysis of the Influence of Project Communication Management on Owner Decision to Improve Implementation Time Performance in High-Rise Building Construction Projects
DOI:
https://doi.org/10.32832/astonjadro.v14i2.17646Keywords:
construction; communication; management; owner; decision; contractor performance.Abstract
Building high-rises is one example of a property business sector construction project involving various interested parties. The issue that high-rise building construction projects frequently encounter at PT X as the property developer prevented the intended completion date from being met. In high-rise building construction projects, this study examines how owner decisions affect implementation time performance based on project communication management. This study used multiple regression analysis with SPSS and SemPLS, and the sample size consisted of 80 respondents. According to the research findings, project communication management positively and significantly influences owner decisions in high-rise building construction projects; owner decisions also positively and significantly influence contractor performance in high-rise building construction projects; and owner decisions positively and significantly influence consultant performance in building construction projects. Owner decisions about high-rise structures have a favorable and significant impact on supplier performance in high-rise building construction projects and supplier, contractor, and consultant performance. has a favorable and noteworthy impact on high-rise building construction projects' schedule performance.
References
Abd Aziz, N., Rahim, F. A. M., & Aziz, N. M. (2022). Systematic Literature Review On Communication In Construction Project Management: Issues Among Project Participants. Journal of Surveying, Construction and Property, 13, 52-70.
Albi, W. M. (2023). Pengaruh Komunikasi Yang Buruk Terhadap Pelaksanaan Proyek Konstruksi Di Kota Lamongan. Agregat, 8(2).
Alzeraa, A. (2018). Impact of project communications effectiveness on construction disputes. Wayne State University.
Azwar, S. (2019). Reliabilitas dan Validitas Edisi 4. Yogyakarta: Pustaka Pelajar.
BRILLIANI, I. L. (2022). Hubungan antara Manajemen Komunikasi Agile dan Kinerja Proyek pada Perusahaan Rintisan di Indonesia (Doctoral dissertation, Universitas Gadjah Mada).
Cakir, I., Kaya, H. D., Dikmen, I., Atasoy, G., & Birgonul, M. T. (2022). An Exploratory Study on Communication Complexity in Mega Construction Projects. In IOP Conference Series: Earth and Environmental Science (Vol. 1101, No. 4, p. 042045). IOP Publishing.
Clough, R.H., Sears, G.A., dan Sears, S.K. (2000): Construction project management, ISBN: 0 – 41 – 32438 – 8, Penerbit: John Wiley & Sons, New York
Damanik, A. D., Lukman, M., & Latupeirissa, J. E. (2021). Analisis faktor komunikasi terhadap tingkat keberhasilan pelaksanaan proyek konstruksi di kabupaten Raja Ampat. Paulus Civil Engineering Research, 1(1).
Darmawan, R. A., & Prasetyo, R. F. (2023). Efektifitas Komunikasi Proyek Konstruksi Saat Pandemi Dari Sudut Pandang Kontraktor. Indonesian Journal Of Construction Engineering And Sustainable Development (Cesd), 6(1), 17-23.
Ervianto, W. I. (2007). Cara tepat menghitung biaya bangunan. Yogyakarta: CV Andi Offset.
Forcada, N., Serrat, C., Rodríguez, S., & Bortolini, R. (2017). Communication key performance indicators for selecting construction project bidders. Journal of Management in Engineering, 33(6), 04017033.
Ghozali, Imam, Hengky Latan. (2015). Konsep, Teknik, Aplikasi Menggunakan Smart PLS 3.0 Untuk Penelitian Empiris. Semarang: BP Undip.
Ghozali, Imam. (2018). Aplikasi Analisis Multivariate dengan Program IBM SPSS 25. Semarang: Badan Penerbit Universitas Diponegoro
Hapsari, W. P., Huda, M., & Rini, T. S. (2018). Pengaruh manajemen komunikasi terhadap kinerja proyek konstruksi (Studi kasus di kota Surabaya). axial: jurnal rekayasa dan manajemen konstruksi, 6(3), 207-214.
Haseeb, M., Bibi, A., & Rabbani, W. (2011). Problems of projects and effects of delays in the construction industry of Pakistan. Australian journal of business and management research, 1(5), 41-50.
Husen, Abrar. (2011). Manajemen Proyek. Yogyakarta: Andi.
Ibdayanti, D. R., Oktavani, C. Z., & Husin, S. (2023). Kepentingan Relatif Faktor-Faktor Integrasi Manajemen Komunikasi Pada Proyek Konstruksi di Banda Aceh. JMTS: Jurnal Mitra Teknik Sipil, 39-48.
Jaya, I., Hasibuan, G. C. R., & Nasution, D. M. (2023). Manajemen Komunikasi Proyek Konstruksi di Masa Pandemi Covid-19. TEKNIK, 44(1), 112-122.
Kania, E., Radziszewska-Zielina, E., & Śladowski, G. (2020). Communication and information flow in polish construction projects. Sustainability, 12(21), 9182.
Khanyile, N. S., Musonda, I., & Agumba, J. N. (2019). Evaluating the relationship between communication management practices and project outcomes: a case study of Eswatini (Swaziland) construction industry. Construction Economics and Building, 19(2), 197-219.
Kurniawan, H., & Anggraeni, I. A. A. (2020). Analisis Risiko Rantai Pasok Material Terhadap Keterlambatan Pelaksanaan Proyek Konstruksi. Rekayasa Sipil, 14(1), 43-50
Latief, Yusuf. (2010). Diktat Kuliah Manajemen Konstruksi, Planning (Perencanaan). Depok: Fakultas Teknik, Universitas Indonesia.
Minooei, F., Sobin, N., Goodrum, P. M., & Molenaar, K. R. (2018). Managing Public Communication Strategies in Accelerated Highway Construction Projects. Transportation Research Record, 2672(26), 1-10.
Nafisah, M. U., & Azzat, N. N. (2019). Penerapan Metode Analytical Hierarchy Process (AHP) untuk Menentukan Supplier Ikan Teri (Studi Kasus di PT. Urchindize Indonesia). JURNAL DISPROTEK-Computer: Information Systems, Informatics; Engineering: Electrical, Industrial, Civil; Aquaculture., 10(2), 86-94.
Nurhayati, N., & Agus, I. (2023). Identifikasi Faktor yang Berpengaruh terhadap Penentuan Pemenang Lelang Jasa Konstruksi:(Studi Kasus Proyek Konstruksi Pemerintah Kabupaten Buton). Jurnal Teknik Sipil, 19(1), 54-68.
Peli, M., Utama, W. P., Jumas, D. Y., Zulherman, Z., Sesmiwati, S., Ariani, V., ... & Thaha, P. (2022). Faktor Determinasi Komunikasi Efektif di Proyek Konstruksi Dari Perspektif Multiple Stakeholders. Jurnal Studi Komunikasi Dan Media, 26(2), 109-122.
Project Management Institute. (2017). A guide to the project management body of knowledge: (PMBOK® guide) (6th ed.). Newtown Square, Pennsylvania, Usa: Project Management Institute.
Ridwan, N., & Putranto, L. S. (2020). Indikator Kinerja Jalan Long Segment di Banten dengan Analisis Analytical Hierarchy Process. Jurnal Muara Sains, Teknologi, Kedokteran dan Ilmu Kesehatan, 4(1), 131-144.
Safapour, E., Kermanshachi, S., & Kamalirad, S. (2021). Analysis of effective project-based communication components within primary stakeholders in construction industry. Built Environment Project and Asset Management, 11(2), 157-173.
Sarah, J. L., Chandra, H. P., & Rahardjo, J. (2022). Faktor-Faktor Yang Mempengaruhi Komunikasi Dan Kompetensi Antara Arsitek Dan Klien Terhadap Keberhasilan Proyek. Dimensi Utama Teknik Sipil, 9(2), 184-199.
Sarstedt, M., Ringe, C.M., & Hair, J.F. (2017). Partial Least Squares Structural Equation Modeling. Handbook of Market Research, 1-4
Sugiyono (2019). Metode Penelitian Kuantitatif, Kualitatif, dan R&D. Bandung: Alphabet.
Soeharto, Iman. (1999). Manajemen Proyek: Dari Konseptual Sampai Operasional. Edisi 2, Cetakan 1. Jakarta: Erlangga.
Suhayati, M. (2022). Improvement Of Road Preservation Fund Regulation In The Law Concerning Road Traffic And Transportation. Info Singkat, PUSLIT BDK, Jakarta, 1-6.
Trach, R., & Bushuyev, S. (2020). Analysis communication network of construction project participants. Scientific Review Engineering and Environmental Sciences (SREES), 29(3), 388-396.
Voordijk, H., & Adriaanse, A. (2016). Engaged scholarship in construction management research: the adoption of information and communications technology in construction projects. Construction management and economics, 34(7-8), 536-551.
Wang, Z., Wang, T., Hu, H., Gong, J., Ren, X., & Xiao, Q. (2020). Blockchain-based framework for improving supply chain traceability and information sharing in precast construction. Automation in construction, 111, 103063.
Wanjau, C. M., Namusonge, G. S., & Lango, B. (2024). Project Team Planning and Performance of Housing Projects in Kenya. Journal of Entrepreneurship and Project Management, 9(1), 12-28.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2025 ASTONJADRO

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Paper submitted to ASTONJADRO is the sole property of the Astonjadro Journal. Unless the author withdraws the paper because he does not want to be published in this journal. The publication rights are in the journal Astonjadro.ASTONJADRO
LICENSE
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Based on a work at http://ejournal.uika-bogor.ac.id/index.php/ASTONJADRO