BIM-based cost estimation, Tekla, Revit, IFC, steel roof structure.Abstract
Development of The Syamsudin Noor Airport Project in Banjarmasin is one of the largest projects in Banjarmasin, South Kalimantan. This project applied BIM-based cost estimation on a steel roof structure. However, the cost estimation for this steel roof structure is applied conventionally. The BIM-based cost estimation could have been applied in collaborating a building information becomes unity in one model. This research will raise the issue of applying BIM-based cost estimation at The Syamsudin Noor Airport Project to find out the effectiveness calculation of cost estimation conventionally and BIM-based cost estimation. The report result by 3D modeling of Tekla is quantity take-offs using as a data for processing the cost analysis conventionally. Whereas the 3D model made by Tekla will be exported to Revit through the interoperability of IFC or application of extention of Tekla warehouse that is "Export to Revit Geometry” for the processing the BIM-based cost estimation analysis. The unit price for the cost calculation is acquired by list price (AHSP or subcontractor value). The result of these both cost calculation, there are large enough difference in cost of these both calculations. Difference of conventional calculations and BIM-based cost estimation using Revit worth Rp 3,690,741,474 - Rp 5,047,206,780 with a percentage of 14% - 20%. Cause of these large enough differences in cost due to the model exported is only 90% succeeded. It happened due to difference thing in the mapping of object profile and difference in shape BREP geometry conditions.
References
Amalia, A. R. (2011). Studi Literatur Tentang Program Bantu Autodesk Revit Structure. Surabaya: Institut Teknologi Sepuluh Nopember. (Indonesian).
Basnet, B. (2016). Scheduling And Visualization Of Erection In Tekla : Construction Of Sheet Metal Centre. Hämeenlinna: Häme University Of Applied Sciences.
Dysert, L. R. (2005). An Introduction To Parametric Estimating. AACE International Transaction.
Eastman, C., Teicholz, P., Sacks, R., & Liston, K. (2011). BIM Handbook : A Guide To Building Information Modeling For Owners, Managers, Designers, Engineers And Contractors. New Jersey: John Wiley & Sons, Inc., Hoboken.
Elbeltagi, E., Hosny, O., Dawood, M., & Elhakeem, A. (2014). BIM Based Cost Estimation/Monitoring For Building Construction. Researchgate, 58-59, 64.
Firoz, S., & Rao, S. (2012). Modelling Concept Of Sustainable Steel Building By Tekla Software. International Journal Of Engineering Research And Development, 19-22.
Hansen, S. (2017). Quantity Surveying. Jakarta: Gramedia Pustaka Utama. (Indonesian).
Ho, A. (2012). Tekla Structures In A Structural Building Information. New York: Albert Nerken School Of Engineering.
Huahui Lai, X. D. (2018). Interoperability Analysis Of IFC-Based Data Exchange Between Heterogeneous BIM Software. Journal Of Civil Engineering And Management, 538-540.
Kesturi, L. (2012). Estimasi Biaya Tahap Konseptual Pada Konstruksi Gedung Perkantoran Dengan Metode Artificial Neural Network. Depok: Universitas Indonesia. (Indonesian).
Kurniawan, K. (2018). Aplikasi Building Informasi Modeling (BIM) Tekla. Surakarta: Fakultas Teknik Universitas Tunas Pembangunan Surakarta. (Indonesian).
Noor Ida Hayati. Firman Hisbullah Amin, 2014. Analisis Biaya Konstruksi Pada Proyek Jalan Di Kota Bogor. ASTONJADRO Jurnal Rekayasa Sipil, 3 (1), pp.27-39. (Indonesian).
http://ejournal.uika-bogor.ac.id/index.php/ASTONJADRO/article/view/802
Oli, A. (2017). Structural BIM Modelling Using Tekla Structures : Focus On A Modelling Process Of An Office Building. Helsinki: Helsinki Metropolia University Of Applied Sciences.
P, C. B., Adhi, R. P., Hidayat, A., & Nugroho, H. (2016). Perbandingan Efisiensi Waktu, Biaya, Dan Sumber Daya Manusia Antara Metode Building Information Modelling (BIM) Dan Konvensional (Studi Kasus: Perencanaan Gedung 20 Lantai). Semarang: Universitas Diponegoro. (Indonesian).
Permadi, W. S. (2017). Penerapan BIM Based Cost Estimation Menggunakan. Yogyakarta: Universitas Gajah Mada. (Indonesian).
Putra, R., Muluk, M., & Alexander, H. (2016). Perbandingan Rencana Anggaran Biaya Konstruksi Baja Konvensional Dan Kayu Sebagai Konstruksi Rangka Atap Bangunan. Padang: Politeknik Negeri Padang. (Indonesian).
Rayendra, & Soemardi, B. W. (2014). Studi Aplikasi Teknologi Building Information. Bandung: Institut Teknologi Bandung. (Indonesian).
Saputri, F. (2012). Penerapan Building Information Modeling (BIM) Pada Pembangunan Struktur Gedung Perpustakaan IPB Menggunakan Software Tekla Structures 17. Bogor: Institut Pertanian Bogor. (Indonesian).
S.Anwar, Noor Ida Hayati, 2013. Analisis Pemakaian Metode Earned Value Sebagai Alat Pengendalian Proyek. ASTONJADRO Jurnal Rekayasa Sipil, 2 (2), pp.19-28. (Indonesian).
http://ejournal.uika-bogor.ac.id/index.php/ASTONJADRO/article/view/795
Syaiful, S., Sutarsa, S. 2020. Analysis of sustainable financial investment feasibility study on housing casase cetrene, Proceedings of the International Conference on Industrial Engineering and Operations Management, 2020, (August), pp.3631-3639. http://ieomsociety.org/detroit2020/proceedings/
Stefanova, T. (2015). Reporting In Tekla Structures. Hämeenlinna: Häme University Of Applied Sciences.
Wibowo, A. (2009). Standar Nasional Indonesia Tentang Tata Cara Perhitungan Harga Satuan: Aplikasi Dan Permasalahannya. Bandung: LIPI. (Indonesian).
Downloads
Published
How to Cite
Issue
Section
License
Paper submitted to ASTONJADRO is the sole property of the Astonjadro Journal. Unless the author withdraws the paper because he does not want to be published in this journal. The publication rights are in the journal Astonjadro.ASTONJADRO
LICENSE
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Based on a work at http://ejournal.uika-bogor.ac.id/index.php/ASTONJADRO