Increasing the Capacity of the Unsignalized Three Way Petir Intersection, Serang Regency

Authors

  • Nila Prasetyo Artiwi INDONESIA
  • Telly Rosdiyani INDONESIA

DOI:

https://doi.org/10.32832/astonjadro.v11i3.8309

Keywords:

intersection, improvement, widening, performance, USIG I.

Abstract

Population growth increases every year, especially in Serang Regency, causing traffic problems including accidents, congestion, or being faced with conditions of frequent road scrambling. In preliminary observations, this happened to the Unsignalized Three Way Petir Intersection . This research was conducted to determine the existing performance of the intersection and find alternative solutions to overcome the problem situation and find out the cost needs needed in planning the proposal. Thus, of course, data is needed to be able to analyze it.  The method used is based on the Indonesian Road Capacity Manual (MKJI) of 1997, the required data consists of primary data by conducting a field survey, to find out the volume of vehicles (Average daily traffic / ADT for seven days from 06.00 to 18.00 WIB, road geometrics, traffic conditions, and environmental conditions. It is known that the Unsignalized Three Way Petir Intersection type is type 322, meaning 3 arms 2 lanes 2 directions, the data uses the form USIG I and the form USIG II from MKJI 1997. The results showed that the existing performance at the Unsignalized Three Way Petir Intersection showed the largest total traffic flow value of 3,480 passenger car unit (pcu) / hour, the saturation degree (DS) value was 1,026, which means, the traffic flow has exceeded the road capacity, with an intersection traffic delay of 16,426 sec / pcu, a delay in main road traffic (B-D) of 7.4584 sec / pcu and a delay in minor road traffic (C) of 38.2352 sec / pcu,  queue odds are between 42.3554% to 84%.  Alternative solutions that can be done prohibit the right turn traffic from minor roads, as well as widening on the main road from 3 m per lane to 3.5 m so that the short width of each lane = 3.5 m and the shoulder width of 0.5 m, in total to 8 m, so that the cost required in the planning is Rp. 2,220,051,000 (two billion two hundred twenty million fifty-one thousand rupiah).

Author Biographies

Nila Prasetyo Artiwi, INDONESIA

Civil Engineering Department, Universitas Banten Jaya Serang

Telly Rosdiyani, INDONESIA

Civil Engineering Department, Universitas Banten Jaya Serang

References

A Setiawan, T Rosdiyani, AS Huda. (2020). Uncited Interchange Planning Using Autodesk Land Destop, JOSCE Journal, Unbaja, Vol 2 No. 2

Alvi Sulandani, (2021). Performance Study of Non-Signaling T-junctions at the Intersection of Land Fisheries Road – Singaparna East Road, Tasikmalaya Regency. Siliwangi University. Tasikmalaya City.

Central Statistics Agency of Serang City, (2020). Number of Serang City Population

Department of Public Works. ( 1997), Indonesian Road Capacity Manual (MKJI). Directorate General of Bina Marga, Jakarta.

Directorate General of Wildlife Development, (1992), Geometric Planning Standards for Urban Roads, Directorate of Urban Road Development, Jakarta

Harianto, Joni (2004), Traffic Control System at a Plot Road Meeting, Digitized by USU Digital Library, 2004 Hendarto, S., et al. Basics of Transportation, Bandung Institute of Technology

Hobbs, F. D (1995), Traffic Engineering Planning

Khisty, C.J dan Lall, B.K. (2005), Basic Basics of Transportation Engineering. Erlangga: Jakarta

Morlok EK, (1985), Introduction to Transportation Engineering and Planning

K. Hainim, Erlangga, Jakarta. http://kampussipil.blogspot.com/2013/06/download-buku-teknik-sipil-transportasi.html Di akses 06 Juni 2020

NP Artiwi, T Rosdiyani, H Hidaytullah. (2020) Performance of the Four way Intersection in Cikole Lintas Timur, Pandeglang Regency, Josce UnbajaVol 2 Journal No.2

Picnataro,J. L. (1973). Traffic Engineering Theory and Practice. US, Pretinc, HallInc

Selter, R. (1974). Highway Traffic Analysis and Design. UK, University of Bradford

S Syaiful, H Siregar, E Rustiadi, ES Hariyadi. (2022). Performance of Three Arms Signalized Intersection at Salabenda in Bogor Regency. ASTONJADRO: CEAESJ 11 (1), 13-29.

S Syaiful. (2017). Engineering Model of Traffic and Transportation Safety with Pattern of Cooperation Between Sustainable Region in Bogor. MATEC Web of Conferences 138 (07008), 1-9.

S Syaiful, D Hariyadi. (2019). Case Study on Sustainable T-Jungtion

Cibinong City Mall (CCM) in Bogor Indonesia. ARPN Journal of Engineering and Applied Sciences 14 (17), 2960-2971.

Tamin O. Z. (1997). Transportation Planning and Coding civil technologists Bandung Institute of Technology

Z Zulfikar, H Pramanda, B Bunyamin. (2022) Traffic Performance Analysis on Jalan Cut Nyak Dhien Simpang Ajun Kabupaten Aceh Besar, Journal of Civil Engineering, Unaya Vol 8 No.1.

Published

2022-09-26

How to Cite

Prasetyo Artiwi, N., & Rosdiyani, T. (2022). Increasing the Capacity of the Unsignalized Three Way Petir Intersection, Serang Regency. ASTONJADRO, 11(3), 721–730. https://doi.org/10.32832/astonjadro.v11i3.8309

Issue

Section

Articles