[1]
Nurrizky, F.E., Suroso, A. and Amin, M. 2024. Analysis the Influence of Manpower, Material, Machine, Method, Money and Environment on the Time Performance of Implementing Cold Storage Building Projects. ASTONJADRO. 14, 1 (Dec. 2024), 108–123. DOI:https://doi.org/10.32832/astonjadro.v14i1.16389.