[1]
Sukardi, I.M. and Biantoro, A.W. 2025. Analysis of Contract Change Order (CCO) Factors, which Affect the Fly Over Work (Case Study of The Cisauk Fly Over Development Project). ASTONJADRO. 14, 1 (Jan. 2025), 133–141. DOI:https://doi.org/10.32832/astonjadro.v14i1.16392.