[1]
Tobing, P.R. and Suroso, A. 2025. Effect of Change Contract Order, Labor, Material, Tools to Time Delayu of Low-Rise State Building Project. ASTONJADRO. 14, 4 (Dec. 2025), 1221–1243. DOI:https://doi.org/10.32832/astonjadro.v14i4.19197.