[1]
Jansen, D.I.R. and Erwin, E. 2026. Cost and Time Control of the Landikma Health Center Project Using Earned Value. ASTONJADRO. 15, 2 (May 2026), 661–678. DOI:https://doi.org/10.32832/astonjadro.v15i2.23074.