[1]
Husin, A.E. and Danumurti, A. 2023. Dynamic Modeling of Time Cost Trade Off in Design and Build Projects of High Rise Office Buildings. ASTONJADRO. 12, 3 (Oct. 2023), 746–752. DOI:https://doi.org/10.32832/astonjadro.v12i3.9070.