Astariani, N. K., Pagehgiri, J., & Pratama, N. (2025). Optimizing Project Implementation Time and Cost Using the Least Cost Method. ASTONJADRO, 14(3), 940–955. https://doi.org/10.32832/astonjadro.v14i3.18758