Tobing, P. R., & Suroso, A. (2025). Effect of Change Contract Order, Labor, Material, Tools to Time Delayu of Low-Rise State Building Project. ASTONJADRO, 14(4), 1221–1243. https://doi.org/10.32832/astonjadro.v14i4.19197