Husin, A. E., & Danumurti, A. (2023). Dynamic Modeling of Time Cost Trade Off in Design and Build Projects of High Rise Office Buildings. ASTONJADRO, 12(3), 746–752. https://doi.org/10.32832/astonjadro.v12i3.9070