PANJAITAN, A. L. P.; HASIBUAN, G. C. R.; ANAS, M. R. The Analysis of Rescheduling the Savanna Sumatera Bridge Project Using the Pert Method . ASTONJADRO, [S. l.], v. 14, n. 2, p. 442–452, 2025. DOI: 10.32832/astonjadro.v14i2.17302. Disponível em: http://150.107.142.43/index.php/ASTONJADRO/article/view/17302. Acesso em: 5 dec. 2025.