Jansen, Davy Ivan Robert, and Erwin Erwin. 2026. “Cost and Time Control of the Landikma Health Center Project Using Earned Value”. ASTONJADRO 15 (2):661-78. https://doi.org/10.32832/astonjadro.v15i2.23074.