Husin, Albert Eddy, and Alwan Danumurti. 2023. “Dynamic Modeling of Time Cost Trade Off in Design and Build Projects of High Rise Office Buildings”. ASTONJADRO 12 (3):746-52. https://doi.org/10.32832/astonjadro.v12i3.9070.