Nurrizky, F. E., Suroso, A. and Amin, M. (2024) “Analysis the Influence of Manpower, Material, Machine, Method, Money and Environment on the Time Performance of Implementing Cold Storage Building Projects”, ASTONJADRO, 14(1), pp. 108–123. doi: 10.32832/astonjadro.v14i1.16389.