Isfahani, M. N., Antonius, A. and Wibowo, K. (2025) “Anticipation and Solutions for Cost Overruns of Material Costs in Toll Road Construction Projects”, ASTONJADRO, 14(2), pp. 692–698. doi: 10.32832/astonjadro.v14i2.18377.