Tobing, P. R. and Suroso, A. (2025) “Effect of Change Contract Order, Labor, Material, Tools to Time Delayu of Low-Rise State Building Project”, ASTONJADRO, 14(4), pp. 1221–1243. doi: 10.32832/astonjadro.v14i4.19197.