HAYATI, N. I.; SALIM, M. A. EVALUASI BIAYA DAN WAKTU DENGAN METODE EARNED VALUE MANAGEMENT (Studi Kasus: Pembangunan Masjid AL-Hijri 2, Universitas Ibn Khaldun Bogor). Jurnal Komposit: Jurnal Ilmu-ilmu Teknik Sipil, [S. l.], v. 3, n. 1, p. 35–38, 2019. DOI: 10.32832/komposit.v3i1.3744. Disponível em: http://150.107.142.43/index.php/komposit/article/view/3744. Acesso em: 19 sep. 2024.